Skip to main content

Autel MaxiSys MS908P Passat ABSESP activating while driving fault finding and repair

This Passat you activate the ABS every time you would put your foot on the break, this until the ABS, ESP and Brake light was illuminated… A quick scan revealed 00290 by using Autel MaxiSys MS908P… But, was this a sensor problem? Follow me on this article to find out what was the problem and how to resolve it.

Car model and year: Volkswagen Passat 2008

The issue:

After starting the engine,

ESP light on

ABS light on

Parking brake light on

autel-maxisys-passat-2008-abs-esp-light-on-reset-01 (3)

Passat Scanner to use: Autel MaxiSys MS908P

I’ve already scanned the car, the ABS code is 00290 (left rear ABS wheel speed sensor implausible signal).

autel-maxisys-passat-2008-abs-esp-light-on-reset-02 (3)

when I drive the car, one of the things I notice is as soon as I put my obviously now it doesn’t do it because there is a fault, if I clear the fault, the fault goes away, and when I drive the car as soon as I press the brake I can feel the ABS pump working and I can feel it on the pedal and I can hear it and every time you break and you carry on doing this a few times until it daily triggers the light.

What says in Autel Scanner MaxiSys MS908P, there is implausible signals, so the pump or the unit is getting a signal from the sensor. However, when you first press, if I clear the codes when I first press the brake. The unit will get the signal, something the wheel is sleeping or whatever and he’s going to obviously do what he has to do, only a few times later, because it’s always the same thing, the unit is programmed to obviously. See that something is now right and trigger the fault, and that’s the reason why it took me a little bit to make the lights come on.

autel-maxisys-passat-2008-abs-esp-light-on-reset-03 (3)

Driving the car.

We go but they eventually come on as you’ve seen, so, another thing is and let me show you because while I was there driving I did a little bit off.

autel-maxisys-passat-2008-abs-esp-light-on-reset-04 (3)

Enter ” Data Manager”.

autel-maxisys-passat-2008-abs-esp-light-on-reset-05 (3)
And then “Review Data, then “Volkswagen”.

autel-maxisys-passat-2008-abs-esp-light-on-reset-06 (3)
autel-maxisys-passat-2008-abs-esp-light-on-reset-07 (3)

I can only do three here.

autel-maxisys-passat-2008-abs-esp-light-on-reset-08 (3)

I can only do next frame, anyway I took some live data and as you can see I have my front car, I can only have three, so I have my front right, speed rear left and rear right so the rear left is going to be my green and then so that should be the one that I needed to look at and as I start to go, so I was driving the car.

Start the drive. And then look at that the green line.

I think it’s quite self-explanatory what’s going on.

That sensor is breaking either that or a wiring problem, so the sensor is reading and dropped.

Reads again then drops all these is dropping.

So is dropping at a certain speed, so either we have a sense of problem or we have a wire problem, most likely this answer because otherwise wouldn’t read nothing at all I would say, but we don’t know that yet.

So my next step is going to be take the wheel out take this sensors and do an inspection and go from there really now at the moment.

I think we easily established that the problem is going to be somewhere on the signal from the sensor to the ABS or the sensor itself.

autel-maxisys-passat-2008-abs-esp-light-on-reset-09 (3)

Okay guys problem found so the first thing I’ve done was obviously take the sensor off.

You can easily see that the sensor has been rubbing on the magnetic reflector ring. It’s

marks there now when I cross a magnet in front of this which I have one here.

autel-maxisys-passat-2008-abs-esp-light-on-reset-10 (3)

Okay, obviously it’s too big, but I can easily make a numbers to appear on the speed of these wheel, quite erratic but doesn’t matter, it is working cable looks okay, connection looks OK.

autel-maxisys-passat-2008-abs-esp-light-on-reset-11 (3)

So because of the state of this disk and in the fact I was touching what I decided to do was to put the camera, the Autel scope camera there and the hole of where the sensor is and that’s exactly what I’m going to show you now, so that’s the magnetic ring now I’m going to turn the wheel, I know the light is not brilliant, let’s see if I can be slightly different, let me actually put the phone down I can actually look at this properly.

autel-maxisys-passat-2008-abs-esp-light-on-reset-12 (3)
autel-maxisys-passat-2008-abs-esp-light-on-reset-13 (3)

There we go, so I’m going to rotate the wheel.

Okay, so to start with I don’t know if you can see there is a crack where is it okay, I’ll go this way, so quite a little bit of damage in there.

oh, look at that: another crack in there, not very good, it’s a really bad, another crack right there.

Another libya missing there.

And this is the worst point, look at that, so the magnetic layer look at that there is and then there’s there.

You just finished look the other way. It’s missing, you can see how bad it is. It’s completely gone.

So when he goes through this area here is when he fails to read look all gone and then comes up again, you can see there.

Then you have the ring again, if I go back.

it literally needs a new hub, a new bearing as far as I’m aware, this is attached, is one of those bearings with the reflector ring at the back, so it’s  going to need a new hub, there’s nothing else I can do, most likely still okay, so we’re gonna get a hub and when I get a hub and replace it test it.

and should be about it really I think.

Good I have the camera, otherwise it will be very difficult to spot and hold bank it would be a little bit more tricky to diagnose but they we go there, we know what the problem is now that’s going to get the parts and get these going.

And there is a brand new one, so let’s gonna crack on with this and get it replaced.

Right, caliper is out honestly this car is in need of a break job to be honest with you it’s really bad, right now we’re going to take the carrier, so we can then take the disc and then have to take the bearing.

Okay, and he was definitely a challenge to take the carrier out ready hurt myself

And funny enough I didn’t even hurt myself here, hurt myself closing the drawer on the Van, radio anyway so that’s out was definitely a challenge to take these two bolts from the carrier, the bearing I think just a spur the camera.

That we’ve seen: no rocket science.

Just come out.

so the new bearing, so just curiosity comes with a new cap comes with a new bolt so we’re not going to reuse the bolt it comes with a new bolt.

And I’m going to put everything back on, I’m not going to take you through the law, I’m just literally gonna put everything back on. I’m going to probably take the calipers give you a good clean and a little bit of Chris at least on this side because I’m touching it.

For now I’m going to put everything back on because it’s getting dark even though it might not look on the camera but it’s getting dark and I want to get things done today and tomorrow, I’ll try the car tomorrow morning, but yeah for now I’m not going to take you through anything else just put everything back on.

autel-maxisys-passat-2008-abs-esp-light-on-reset-14 (3)
autel-maxisys-passat-2008-abs-esp-light-on-reset-15 (3)
autel-maxisys-passat-2008-abs-esp-light-on-reset-16 (3)

Alright, I’m glad I did the thing yesterday because.

right, let’s go to clear these lights to start with a vision clear the car yet so I’m going to clear the lights and then we’re gonna go for a drive and fingers crossed, the problem is solved.

autel-maxisys-passat-2008-abs-esp-light-on-reset-17 (3)

autel-maxisys-passat-2008-abs-esp-light-on-reset-18 (3)

Okay, we cleared fault free let’s go.

autel-maxisys-passat-2008-abs-esp-light-on-reset-19 (3)

Okay, first thing: no lights; secondly, I definitely can see oil I can’t feel that and what you call it I can’t feel the pedal a vibrating anymore, so there is no activating the ABS, anymore, when I press the pedal which would happen like.

Even like now if I press the pedal I could feel it, it’s absolutely perfect now, no lights come back on everything’s good.

I’m just gonna turn around and load the live data from Autel MaxiSys MS908P once more, just curiosity really because I know we fixed, but just to show you guys, I’ll show you the live data just for you to see that and this is OK now, so let me just turn around here and I’ll show you.

Okay, so here we have it so real left as you can see up there is the green line, so I’m going to start to drive.

There we go. I think is self explanatory. Beautiful.

That’s it.

autel-maxisys-passat-2008-abs-esp-light-on-reset-20 (3)

And back home and ready to move to the next, and last issue with this car, so stay tuned, but for this one guys as you’ve seen problem is fixed cars driving absolutely spot on and in the end was just that reflector ring on the bearing, sensor is OK, the sensor is the same one as before, and yeah that’s it guys, we got it fix.

One thing that I would probably say is that the way I look at this unless the other side has been changed recently it might be very close to having the same who knows, but for now he’s fixed guys and that’s the main thing, so that’s gonna wrap up these guys, I hope you enjoy this article, hope there’s some information, whatever you’re going to find useful.

https://autelscantools.blogspot.com/2021/08/autel-maxisys-ms908p-passat-absesp.html

Comments

Popular posts from this blog

How to setup BMW ISTA/P Loader for ICOM A2 ENET cable K+DCAN adapter

The text here, as a user manual of BMW ISTA/P Loader / ICOM Emulator,  is aimed to help those puzzled with ISTA/P Loader setup for  ICOM A2 , ENET cable, K+DCAN  USB interface. Note: all info here not original, shared by a forum member So try at your own risk! Main content: Part 1 – Compatible device Part 2 – Latest ISTA/P Loader update information Part 3 – How to install ISTA/P Loader v4.x Part 4 – How to use  ISTA/P loader with ICOM A2, K+DCAN cable, ENET cable Part 5 – How to shut down ISTA/P Part 1 – Compatible device: ISTA/P Loader compatible with ICOM A2 (OEM or clone), K+DCAN USB and ENET   Part 2 – Latest ISTA/P Loader update information: NEWEST – ISTA/P Loader V4.8  update info: Free download BMW ISTA-P Loader V4.8.7 to get all new info yourself …… ISTA/P Loader V4.2 update info: Custom resolution option added Improved detection of bmw scan tool ISTA-P install location. Improved compatibility with windows 10 Code...

Hyundai Automatic Transaxle-No Movement in Drive or Reverse Gear Repair

If you are servicing a vehicle with no movement in drive or reverse gear, follow the procedure shown below.And for more Hyundai projects,please check here:Hyundai Repair Cases REPAIR PROCEDURE: 1.Check for DTC in both the “Engine” and “Automatic Transaxle” menus: *   If DTC are found,you need repair it firstly. *   If no DTC are found, go to Step 2. 2.Remove the dipstick and check the ATF for a strong burnt smell. If the smell does not provide conclusive results, remove the oil pan and check for metal particles in the pan: *   If a strong burnt smell or metal particles are found, replace the transaxle *   If not, go to Step 3 NOTE: ATF that is a dark brown or black color does not indicate an internal transaxle concern;do not replace the transaxle. SPIII may change color to a dark brown after 10,000 to 25,000 miles in service. This change is normal for this type of ATF. VERIFY THE RANGE SWITCH ADJUSTMENT: 3.Move the shift lever to ...

JOHN DEERE DIAGNOSTIC OPTIONS

JOHN DEERE DIAGNOSTICS John Deere has recently been in the news because of their strict opposition to allowing farmers, equipment owners, and repair shops access to the information they need to repair and maintain their vehicles. If you read the main stream news, you would be left to believe that John Deere diagnostic with a computer is impossible. Well, we are here to help dispel that myth and give some more exposure to some tools that actually do perform diagnostics on John Deere. There are actually several solutions in the market, some of which we will cover in this post. JOHN DEERE EDL AND SERVICE ADVISOR The very best solution in the market is what the dealers use. John Deere dealers use a combination of PC-based computer with two critical components – John Deere Service Advisor software and the John Deere EDL v3 Adapter . The EDL v3 adapter looks like the picture shown below. It comes with a hard carry case, the adapter itself, a 9-pin connector, and the USB ca...